TSX:MOZ
Marathon Gold
Valentine Lake Project : Leprechaun Deposit
Last Updated: Jun 04, 2019
  • Drill intercepts
  • Intercepts released June 4, 2019

Tip: click & drag the image above to rotate the model.

This 3D display has a cutoff slider that is user controlled. The maximum cutoff value has been arbitrarily set to 15 g/t gold while the highest assay value within the Marathon deposit exceeds 1,300 g/t gold.

  • Location: Newfoundland, Canada
  • Principal commodity: Gold
  • 390 holes plotted
  • 86,080m of drilling shown

Download drill plan in Google Earth