Corebox.net is closing

At the end of February, Corebox will cease to display drill results on this website. I wish to thank our loyal clients for their business over the previous twelve years. Running Corebox and meeting so many of you in the industry has been a great pleasure.

Please make sure to take any screenshots you need of the displays. Starting March 1st, you won’t be able to login to the site or view the pages that are currently public. All unearned subscription fees will be returned to clients by mid-February.

If you need to get in touch, you can reach me via the Contact Us page.

Sincerely,
Jonathan Longe
President

TSV:BBB
Brixton Metals
Thorn Project : Oban Zone
Last Updated: Jan 09, 2014
  • most recently released intercepts
  • previously released intercepts

Tip: click & drag the image above to rotate the model.

Silver equivalent (AgEq) values were calculated using $1,088 per ounce of gold, $19.62 per ounce of silver, $3.20 per pound for copper $0.80 per pound of lead, $0.80 per pound of zinc, all with 100% metal recoveries assumed. AgEq = Ag g/t + (Au g/t x 34.98/0.63) + (Pb% x 17.64/0.63) + (Zn% x 17.64/0.63) + (Cu% x 70.55/0.63)

  • Location: British Columbia, Canada
  • Principal commodity: Silver
  • 75 holes plotted
  • 10,995m of drilling shown

Download drill plan in Google Earth